Horse Tribal Quilt Bedding Set Native America Pattern Set Gift for Horses Fan
$78.95 – $108.95Price range: $78.95 through $108.95
Tribal Cat Quilt Bedding Set Native American Bedspread Black Cat Themed
$78.95 – $108.95Price range: $78.95 through $108.95
$78.95 – $108.95Price range: $78.95 through $108.95
SKU:
117739
Category: Bedding Set
Fast Delivery
Fast and secure delivery to your location
Free & easy returns
Return requests can be made within 30 days of delivery.
Description
Description
Patriotic Petals Quilted Bedding Set Duvet Cover Queen Best 4Th Of July Gifts
- Made in the USA
- Exclusive products made by: Trendyhomewear.
- Each quilt features a premium polyester print for beautiful color vibrancy, even after washing.
- Constructed from an ultra-soft polyester fabric with a hypo-allergenic cotton filling.
- The diamond stitched pattern gives a luxurious feel that is cozy and breathable, perfect for all year round use.
- Each quilt bed set includes a pair of two pillow covers that feature a one-sided print, seamless dual flap closure and do not include pillow inserts.
- Machine washable with cold water gentle cycle and mild detergent.
- This product is only black border.
- Decoration Type: Sublimation.
- Various sizes:
- Single (60×72 IN)
- Twin (70×87 IN)
- Queen (91×91 IN)
- King (104×92 IN)
- Please note: Since our products are custom-made, there may be a variation of around 20% in color, pattern, binding, and stitching compared to the sample images. However, we guarantee that the core design will remain true to what is shown.
All products are made to order and proudly printed to the best standards available.
Reviews
Related products
Select options
This product has multiple variants. The options may be chosen on the product page
Midnight Crow Quilted Bedding Set Bed Decorations Unique Raven Theme Gifts
$78.95 – $108.95Price range: $78.95 through $108.95
Select options
This product has multiple variants. The options may be chosen on the product page
Hippie Haven Quilted Bedding Set Best Comforter Sets Gifts For Hippie Mom
$78.95 – $108.95Price range: $78.95 through $108.95
Select options
This product has multiple variants. The options may be chosen on the product page
Sacred Geometry Quilted Bedding Set Bed Room Decoration Native American Presents
$78.95 – $108.95Price range: $78.95 through $108.95
Select options
This product has multiple variants. The options may be chosen on the product page
Shoreside Sentinel Quilted Bedding Set Bedroom Decorations Lighthouse Themed Gifts
$78.95 – $108.95Price range: $78.95 through $108.95
Select options
This product has multiple variants. The options may be chosen on the product page
